Skip to main content
Liburdi
Quick Search   
Go Search
blank
blank
Liburdi Turbine Services > GE 6B 7EA 9E
Product Image

GE Frame 6B Frame 7EA Frame 9E Repairs

Stage 1 Nozzle Repair – Extended Life Repairs

  • High strength LPM® process for heavy crack repairs – outperforms conventional welding
  • LPM® re-construction of trailing edge wall thickness
  • LPM® re-construction - re-establishes critical throat dimensions
  • Advanced MCrAlY coatings and TBC coating upgrade available

Stage 2 and Stage 3 Nozzle Repair – Extended Life Repairs

  • High strength LPM® process for heavy crack repairs - outperforms conventional welding
  • Precision machining - restores distortion and downstream lean
  • Advanced aluminide coating upgrade available

GE Frame 6B Frame 7EA Frame 9E Repairs

Stage 1 Bucket Repair – Life Extended to 100,000+ Hours

  • Full coating strip – internal and external coatings
  • FSR® Full Solution Rejuvenation® heat treatment process - restores alloy strength
  • Re-coat external and internal – MCrAlY plus over aluminizing coating
  • Proven over 100,000 hours reliable service for fleets

Stage 2 Bucket Repair – Upgraded and Life Extended to 100,000+ Hours

  • High strength LPM® Process – restores shroud lift and twist distortion
  • FSR® Full Solution Rejuvenation® heat treatment process - restores alloy strength
  • Airfoil aluminide coating upgrade - extends service life

Bucket Upgrades for Frame 7EA to Increase Power and Efficiency

  • Applied as retrofit upgrade - avoids new parts purchase
  • Tip modifications on Stage 1 - yield 0.5 MW increase and improved oxidation resistance
  • Shroud modifications on Stage 2 - yield 0.5 MW increase
ThumbnailFrame 6B 7EA 9E
PDF Datasheet